Burlington School District RE-6J is accepting proposals for Priority 2 services for the 2014-2015 E-rate funding year. Please use the links below to find documentation in regards to our current RFPs. Priority 2 Internal Connections Projects are mainly related to the overhaul of our WiFi for all three schools. Questions can be directed to the District Technical Director Russell LindenschmidtE-Rate Completed 470 FY2015 for BSD -WiFi Access Points -The current access points in the High school are Ruckus ZoneFlex 7982. (2-10-15) -WiFi Controllers -The current controller in the High school is a Ruckus Wireless ZoneDirector 1106. (2-10-15) -A total of two new controllers are desired, one in the Elementary and one in the Middle school. This is due to network layout/design. (2-10-15) |
Openings >